2020

August 2020

August

  • Retrofit plates added to inside of existing foundation
  • It’s gotten very hot in the house with no walls or roof to speak of and definitely no air conditioning
  • Concrete work continues 
  • 1st inspection passed! – for foundation/slab
  • Poured foundation for front addition, added footings for second story support
  • Hold downs installed
  • One of the cats successfully caught and killed a rat that got in through a small hole in the floor that hadn’t been patched yet
  • Termite flashing, mud sills, girders and floor joists built for front addition
  • Future water main supply and grounding wire added