March
- Fixed back fence where tree had damaged it
- COVID sent us all home 3/13/2020
- More concrete removed – had to buy a concrete saw
April
- Garage was too close to the power line easement and will have to be completely removed in the remodel. The main water supply comes into the garage so will have to be moved.
- Dug trench and installed temporary water supply line


