2021

November, 2021

  • Primary bedroom-bathroom suite tile floor installed and toilet installed
  • Removal of all patio and driveway concrete to prepare for new patio and driveway 
  • Yard regraded and drain pipes installed
  • Living room mudded, sanded, and painted
  • Under stairs coat closet mudded, sanded, and painted. Laminate floor installed 
  • Patio and back step pavers installed (Calstone Brown Beige Charcoal)

Leave a Reply

Your email address will not be published. Required fields are marked *