Skip to content
Kingston Way

Kingston Way

A Residential Construction Blog

  • Before and After
  • FAQ

Category: 2021

October 2021
2021

October 2021

Fence pressure washed and stained Garage organized and storage sheds removed Playroom mudded, sanded, and painted Stone veneer installed (California…
December 10, 2021December 10, 2021 Elena Bryson
September, 2021
2021

September, 2021

Mudding, sanding, and painting of primary bedroom and walk-in closet Other downstairs bedroom drywall repair and painted Other upstairs bedroom…
December 10, 2021December 10, 2021 Elena Bryson
November, 2021
2021

November, 2021

Primary bedroom-bathroom suite tile floor installed and toilet installed Removal of all patio and driveway concrete to prepare for new…
December 4, 2021December 10, 2021 Elena Bryson
August 2021
2021

August 2021

Living room drywalled (two layers with soundproofing glue) including living room ceiling soffet Upstairs bedroom closet installed  Entryway and kitchen…
December 4, 2021 Elena Bryson
July 2021
2021

July 2021

Laundry room complete, siding complete, upstairs bedroom painted.
August 8, 2021 Elena Bryson
June 2021
2021

June 2021

Garage door, new tree, drywall repaired.
August 8, 2021 Elena Bryson
May 2021
2021

May 2021

Drywall, laundry room, new trees.
August 8, 2021 Elena Bryson
April 2021
2021

April 2021

Plumbing, drywall.
August 8, 2021August 8, 2021 Elena Bryson
March 2021
2021

March 2021

Inspections, insulation, shower pan.
August 8, 2021August 8, 2021 Elena Bryson
February 2021
2021

February 2021

Electric circuits for lights and outlets, Wall and ceiling insulation installed, HVAC for upstairs installed
August 8, 2021December 5, 2021 Elena Bryson

Posts navigation

Older Posts

Categories

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
WordPress Theme: BlogGrid by TwoPoints.